The brief for St. Martins Church Design Competition called for a commercially viable use & redesign for this large, neglected, Grade II listed church in Brighton. A “closed loop” waste to product use such as paper re-cycling, coffee beans even wood pellets, was designed. Mandated service additions are used, to increase visibility & accessibility and, to structure usable space while hosting various lifeforms!
*We built a team with CHsimple Engineers & CES Services consultants.